Completed projects

I have made a small dent in my MASSIVE unfinished knitting projects pile!  I finished a sweater/dress I had been working on.  It is modern wear and it is intended for wear with leggings.  IMG_20191226_143124881.jpg

The photo with me in it isn’t a good one.  But you get the idea.

IMG_20191229_214513.jpg

Need some control top undies with this!

I had a lot of wool left over and I was in desperate need of new mittens.

I knit up a pair and then decided I wanted a fluffy lining for added warmth.  So with a crochet hook, I filled the inside with “fringe”.

IMG_20191228_145424736.jpg

Once I had the wool hooked in, I split the strands up.

IMG_20191228_145613914.jpg

Once that was done I had a Muppet mitt!

IMG_20191228_164926849.jpg

Flip the mitt right side out and I have a woolly mitt.

IMG_20191228_165117739.jpg

I have lost two pairs of mitts already (and it is only December!) so I put them on a string and now, like all six year olds, my mitts hang out of my sleeve on strings when I take them off.  Second childhood….

3 thoughts on “Completed projects

  1. The sweater-dress looks great! It fits well so it won’t be bulky under a coat. Great colors, too. My sweaters are too bulky to wear with anything but a light jacket.

  2. severn14 says:

    Both of these projects are great! lol @ muppet mitt!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s